# Installation of plastic service lines by trenchless excavation.

- **operation:** document
- **citation:** 49 CFR 192.376
- **title:** Installation of plastic service lines by trenchless excavation.
- **source type:** regulation
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** 2026-08-18
- **summary:** Plastic service lines installed by trenchless excavation must comply with the following:

(a) Each operator shall take practicable steps to provide sufficient clearance for installation and maintenance activities from other underground utilities and structures at the time of installation.

(b) For e
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/49-cfr-192-376.json
- **markdown:** https://regulus.evalyn.ai/document/49-cfr-192-376.md
- **app url:** https://regulus.evalyn.ai/document/49-cfr-192-376
- **source url:** https://www.ecfr.gov/on/2026-08-18/title-49/section-192.376
**body:**

Plastic service lines installed by trenchless excavation must comply with the following:

(a) Each operator shall take practicable steps to provide sufficient clearance for installation and maintenance activities from other underground utilities and structures at the time of installation.

(b) For each pipeline section, plastic pipe and components that are pulled through the ground must use a weak link, as defined by § 192.3, to ensure the pipeline will not be damaged by any excessive forces during the pulling process.

[Amdt. 192-124, 83 FR 58719, Nov. 20, 2018]
- **truncated:** false
- **body characters:** 569
