{"operation":"document","citation":"49 CFR 192.69","title":"Storage and handling of plastic pipe and associated components.","source_type":"regulation","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":null,"effective_on":"2026-08-18","summary":"Each operator must have and follow written procedures for the storage and handling of plastic pipe and associated components that meet the applicable listed specifications.\n\n[83 FR 58716, Nov. 20, 2018. Redesignated by Amdt. 192-125, 84 FR 52244, Oct. 1, 2019]","machine_formats":{"json":"https://regulus.evalyn.ai/document/49-cfr-192-69.json","markdown":"https://regulus.evalyn.ai/document/49-cfr-192-69.md"},"app_url":"https://regulus.evalyn.ai/document/49-cfr-192-69","source_url":"https://www.ecfr.gov/on/2026-08-18/title-49/section-192.69","body":"Each operator must have and follow written procedures for the storage and handling of plastic pipe and associated components that meet the applicable listed specifications.\n\n[83 FR 58716, Nov. 20, 2018. Redesignated by Amdt. 192-125, 84 FR 52244, Oct. 1, 2019]","truncated":false,"body_characters":260}