# Storage and handling of plastic pipe and associated components.

- **operation:** document
- **citation:** 49 CFR 192.69
- **title:** Storage and handling of plastic pipe and associated components.
- **source type:** regulation
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** 2026-08-18
- **summary:** Each operator must have and follow written procedures for the storage and handling of plastic pipe and associated components that meet the applicable listed specifications.

[83 FR 58716, Nov. 20, 2018. Redesignated by Amdt. 192-125, 84 FR 52244, Oct. 1, 2019]
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/49-cfr-192-69.json
- **markdown:** https://regulus.evalyn.ai/document/49-cfr-192-69.md
- **app url:** https://regulus.evalyn.ai/document/49-cfr-192-69
- **source url:** https://www.ecfr.gov/on/2026-08-18/title-49/section-192.69
**body:**

Each operator must have and follow written procedures for the storage and handling of plastic pipe and associated components that meet the applicable listed specifications.

[83 FR 58716, Nov. 20, 2018. Redesignated by Amdt. 192-125, 84 FR 52244, Oct. 1, 2019]
- **truncated:** false
- **body characters:** 260
