# Scope.

- **operation:** document
- **citation:** 49 CFR 193.2051
- **title:** Scope.
- **source type:** regulation
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** 2026-08-18
- **summary:** Each LNG facility designed, constructed, replaced, relocated or significantly altered after March 31, 2000 must be provided with siting requirements in accordance with the requirements of this part and of NFPA 59A (incorporated by reference, see § 193.2013). In the event of a conflict between this p
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/49-cfr-193-2051.json
- **markdown:** https://regulus.evalyn.ai/document/49-cfr-193-2051.md
- **app url:** https://regulus.evalyn.ai/document/49-cfr-193-2051
- **source url:** https://www.ecfr.gov/on/2026-08-18/title-49/section-193.2051
**body:**

Each LNG facility designed, constructed, replaced, relocated or significantly altered after March 31, 2000 must be provided with siting requirements in accordance with the requirements of this part and of NFPA 59A (incorporated by reference, see § 193.2013). In the event of a conflict between this part and NFPA-59A-2001, this part prevails.

[Amdt. 193-17, 65 FR 10958, Mar. 1, 2000, as amended by Amdt. 193-18, 69 FR 11336, Mar. 10, 2004; Amdt. 193-25, 80 FR 182, Jan. 5, 2015]
- **truncated:** false
- **body characters:** 480
