{"operation":"document","citation":"49 CFR 193.2143","title":"Lightning.","source_type":"regulation","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":null,"effective_on":"1999-10-01","summary":"Each operator shall install proper grounds as necessary to minimize the hazard to plant personnel and components, including all electrical circuits, as a result of lightning.","machine_formats":{"json":"https://regulus.evalyn.ai/document/49-cfr-193-2143.json","markdown":"https://regulus.evalyn.ai/document/49-cfr-193-2143.md"},"app_url":"https://regulus.evalyn.ai/document/49-cfr-193-2143","source_url":"https://www.govinfo.gov/app/details/CFR-1999-title49-vol3/CFR-1999-title49-vol3-sec193-2143","body":"Each operator shall install proper grounds as necessary to minimize the hazard to plant personnel and components, including all electrical circuits, as a result of lightning.","truncated":false,"body_characters":174}