{"operation":"document","citation":"49 CFR 193.2309","title":"Inspection and testing methods.","source_type":"regulation","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":null,"effective_on":"1999-10-01","summary":"Except as otherwise provided by this subpart, each operator shall determine, commensurate with the hazard that would result from failure of the component concerned, the scope and nature of—\n\n(a) Inspections and tests required by this subpart; and\n\n(b) Inspection and testing procedures required by § ","machine_formats":{"json":"https://regulus.evalyn.ai/document/49-cfr-193-2309.json","markdown":"https://regulus.evalyn.ai/document/49-cfr-193-2309.md"},"app_url":"https://regulus.evalyn.ai/document/49-cfr-193-2309","source_url":"https://www.govinfo.gov/app/details/CFR-1999-title49-vol3/CFR-1999-title49-vol3-sec193-2309","body":"Except as otherwise provided by this subpart, each operator shall determine, commensurate with the hazard that would result from failure of the component concerned, the scope and nature of—\n\n(a) Inspections and tests required by this subpart; and\n\n(b) Inspection and testing procedures required by § 193.2305.","truncated":false,"body_characters":309}