{"operation":"document","citation":"49 CFR 193.2325","title":"Testing control systems.","source_type":"regulation","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":null,"effective_on":"1999-10-01","summary":"Each control system must be tested before being placed in service to assure that it has been installed properly and will function as required by this part.","machine_formats":{"json":"https://regulus.evalyn.ai/document/49-cfr-193-2325.json","markdown":"https://regulus.evalyn.ai/document/49-cfr-193-2325.md"},"app_url":"https://regulus.evalyn.ai/document/49-cfr-193-2325","source_url":"https://www.govinfo.gov/app/details/CFR-1999-title49-vol3/CFR-1999-title49-vol3-sec193-2325","body":"Each control system must be tested before being placed in service to assure that it has been installed properly and will function as required by this part.","truncated":false,"body_characters":155}