{"operation":"document","citation":"49 CFR 193.2611","title":"Fire protection.","source_type":"regulation","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":null,"effective_on":"2026-08-18","summary":"(a) Maintenance activities on fire control equipment must be scheduled so that a minimum of equipment is taken out of service at any one time and is returned to service in a reasonable period of time.\n\n(b) Access routes for movement of fire control equipment within each LNG plant must be maintained ","machine_formats":{"json":"https://regulus.evalyn.ai/document/49-cfr-193-2611.json","markdown":"https://regulus.evalyn.ai/document/49-cfr-193-2611.md"},"app_url":"https://regulus.evalyn.ai/document/49-cfr-193-2611","source_url":"https://www.ecfr.gov/on/2026-08-18/title-49/section-193.2611","body":"(a) Maintenance activities on fire control equipment must be scheduled so that a minimum of equipment is taken out of service at any one time and is returned to service in a reasonable period of time.\n\n(b) Access routes for movement of fire control equipment within each LNG plant must be maintained to reasonably provide for use in all weather conditions.","truncated":false,"body_characters":356}