# Construction, installation, inspection, and testing.

- **operation:** document
- **citation:** 49 CFR 193.2705
- **title:** Construction, installation, inspection, and testing.
- **source type:** regulation
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** 2026-08-18
- **summary:** (a) Supervisors and other personnel utilized for construction, installation, inspection, or testing must have demonstrated their capability to perform satisfactorily the assigned function by appropriate training in the methods and equipment to be used or related experience and accomplishments.

(b) 
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/49-cfr-193-2705.json
- **markdown:** https://regulus.evalyn.ai/document/49-cfr-193-2705.md
- **app url:** https://regulus.evalyn.ai/document/49-cfr-193-2705
- **source url:** https://www.ecfr.gov/on/2026-08-18/title-49/section-193.2705
**body:**

(a) Supervisors and other personnel utilized for construction, installation, inspection, or testing must have demonstrated their capability to perform satisfactorily the assigned function by appropriate training in the methods and equipment to be used or related experience and accomplishments.

(b) Each operator must periodically determine whether inspectors performing construction, installation, and testing duties required by this part are satisfactorily performing their assigned functions.

[45 FR 9219, Feb. 11, 1980, as amended by Amdt. 193-18, 69 FR 11337, Mar. 10, 2004]
- **truncated:** false
- **body characters:** 581
