{"operation":"document","citation":"49 CFR 195.128","title":"Station piping.","source_type":"regulation","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":null,"effective_on":"2026-08-18","summary":"Any pipe to be installed in a station that is subject to system pressure must meet the applicable requirements of this subpart.","machine_formats":{"json":"https://regulus.evalyn.ai/document/49-cfr-195-128.json","markdown":"https://regulus.evalyn.ai/document/49-cfr-195-128.md"},"app_url":"https://regulus.evalyn.ai/document/49-cfr-195-128","source_url":"https://www.ecfr.gov/on/2026-08-18/title-49/section-195.128","body":"Any pipe to be installed in a station that is subject to system pressure must meet the applicable requirements of this subpart.","truncated":false,"body_characters":127}