{"operation":"document","citation":"49 CFR 195.200","title":"Scope.","source_type":"regulation","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":null,"effective_on":"2026-08-18","summary":"This subpart prescribes minimum requirements for constructing new pipeline systems with steel pipe, and for relocating, replacing, or otherwise changing existing pipeline systems that are constructed with steel pipe. However, this subpart does not apply to the movement of pipe covered by § 195.424.","machine_formats":{"json":"https://regulus.evalyn.ai/document/49-cfr-195-200.json","markdown":"https://regulus.evalyn.ai/document/49-cfr-195-200.md"},"app_url":"https://regulus.evalyn.ai/document/49-cfr-195-200","source_url":"https://www.ecfr.gov/on/2026-08-18/title-49/section-195.200","body":"This subpart prescribes minimum requirements for constructing new pipeline systems with steel pipe, and for relocating, replacing, or otherwise changing existing pipeline systems that are constructed with steel pipe. However, this subpart does not apply to the movement of pipe covered by § 195.424.","truncated":false,"body_characters":299}