# Test pressure.

- **operation:** document
- **citation:** 49 CFR 195.304
- **title:** Test pressure.
- **source type:** regulation
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** 2026-08-18
- **summary:** The test pressure for each pressure test conducted under this subpart must be maintained throughout the part of the system being tested for at least 4 continuous hours at a pressure equal to 125 percent, or more, of the maximum operating pressure and, in the case of a pipeline that is not visually i
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/49-cfr-195-304.json
- **markdown:** https://regulus.evalyn.ai/document/49-cfr-195-304.md
- **app url:** https://regulus.evalyn.ai/document/49-cfr-195-304
- **source url:** https://www.ecfr.gov/on/2026-08-18/title-49/section-195.304
**body:**

The test pressure for each pressure test conducted under this subpart must be maintained throughout the part of the system being tested for at least 4 continuous hours at a pressure equal to 125 percent, or more, of the maximum operating pressure and, in the case of a pipeline that is not visually inspected for leakage during the test, for at least an additional 4 continuous hours at a pressure equal to 110 percent, or more, of the maximum operating pressure.

[Amdt. 195-51, 59 FR 29384, June 7, 1994. Redesignated by Amdt. 195-65, 63 FR 59480, Nov. 4, 1998]