{"operation":"document","citation":"49 CFR 195.308","title":"Testing of tie-ins.","source_type":"regulation","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":null,"effective_on":"2026-08-18","summary":"Pipe associated with tie-ins must be pressure tested, either with the section to be tied in or separately.\n\n[Amdt. 195-22, 46 FR 38360, July 27, 1981, as amended by Amdt. 195-51, 59 FR 29385, June 7, 1994]","machine_formats":{"json":"https://regulus.evalyn.ai/document/49-cfr-195-308.json","markdown":"https://regulus.evalyn.ai/document/49-cfr-195-308.md"},"app_url":"https://regulus.evalyn.ai/document/49-cfr-195-308","source_url":"https://www.ecfr.gov/on/2026-08-18/title-49/section-195.308","body":"Pipe associated with tie-ins must be pressure tested, either with the section to be tied in or separately.\n\n[Amdt. 195-22, 46 FR 38360, July 27, 1981, as amended by Amdt. 195-51, 59 FR 29385, June 7, 1994]","truncated":false,"body_characters":205}