{"operation":"document","citation":"49 CFR 195.591","title":"In-Line inspection of pipelines.","source_type":"regulation","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":null,"effective_on":"2026-08-18","summary":"When conducting in-line inspection of pipelines required by this part, each operator must comply with the requirements and recommendations of API Std 1163, ASNT ILI-PQ, and NACE SP0102 (all incorporated by reference, see § 195.3). An in-line inspection may also be conducted using tethered or remote-","machine_formats":{"json":"https://regulus.evalyn.ai/document/49-cfr-195-591.json","markdown":"https://regulus.evalyn.ai/document/49-cfr-195-591.md"},"app_url":"https://regulus.evalyn.ai/document/49-cfr-195-591","source_url":"https://www.ecfr.gov/on/2026-08-18/title-49/section-195.591","body":"When conducting in-line inspection of pipelines required by this part, each operator must comply with the requirements and recommendations of API Std 1163, ASNT ILI-PQ, and NACE SP0102 (all incorporated by reference, see § 195.3). An in-line inspection may also be conducted using tethered or remote-control tools provided they generally comply with those sections of NACE SP0102 that are applicable.\n\n[Amdt. 195-117, 90 FR 40766, Aug. 21, 2025]","truncated":false,"body_characters":445}