# How does the Department notify service agents of its decision?

- **operation:** document
- **citation:** 49 CFR 40.399
- **title:** How does the Department notify service agents of its decision?
- **source type:** regulation
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** 2026-08-18
- **summary:** If you are a service agent involved in a PIE proceeding, the Director provides you written notice as soon as he or she makes a PIE decision. The notice includes the following elements:

(a) If the decision is not to issue a PIE, a statement of the reasons for the decision, including findings of fact
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/49-cfr-40-399.json
- **markdown:** https://regulus.evalyn.ai/document/49-cfr-40-399.md
- **app url:** https://regulus.evalyn.ai/document/49-cfr-40-399
- **source url:** https://www.ecfr.gov/on/2026-08-18/title-49/section-40.399
**body:**

If you are a service agent involved in a PIE proceeding, the Director provides you written notice as soon as he or she makes a PIE decision. The notice includes the following elements:

(a) If the decision is not to issue a PIE, a statement of the reasons for the decision, including findings of fact with respect to any material factual issues that were in dispute.

(b) If the decision is to issue a PIE—

(1) A reference to the NOPE;

(2) A statement of the reasons for the decision, including findings of fact with respect to any material factual issues that were in dispute;

(3) A statement of the scope of the PIE; and

(4) A statement of the duration of the PIE.
- **truncated:** false
- **body characters:** 670
