# Plastic Pipe

- **operation:** document
- **citation:** 192.59
- **title:** Plastic Pipe
- **source type:** regulation
- **agency:** Arkansas Public Service Commission
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** § 192.59 Plastic Pipe (a) New plastic pipe is qualified for use under this part if: (1) It is manufactured in accordance with a listed specification; (2) It is resistant to chemicals with which contact may be anticipated; and (3) It is free of visible defects. (b) Used plastic pipe is qualified for 
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ar-car-23-500-192-59.json
- **markdown:** https://regulus.evalyn.ai/document/ar-car-23-500-192-59.md
- **app url:** https://regulus.evalyn.ai/document/ar-car-23-500-192-59
- **source url:** https://codeofarrules.arkansas.gov/Rules/Rule?chapterID=40&levelType=part&partID=1394&subChapterID=392&titleID=23
**body:**

§ 192.59 Plastic Pipe (a) New plastic pipe is qualified for use under this part if: (1) It is manufactured in accordance with a listed specification; (2) It is resistant to chemicals with which contact may be anticipated; and (3) It is free of visible defects. (b) Used plastic pipe is qualified for use under this part if: (1) It was manufactured in accordance with a listed specification; (2) It is resistant to chemicals with which contact may be anticipated; (3) It has been used only in gas service; (4) Its dimensions are still within the tolerances of the specification to which it was manufactured; and (5) It is free of visible defects. (c) For the purpose of paragraphs (a)(1) and (b)(1) of this section, when a pipe of a diameter included in a listed specification is impractical to use, pipe of a diameter between the sizes included in a listed specification may be used if it: (1) Meets the strength and design criteria required of pipe included in the listed specification; and (2) Is manufactured from plastic compounds which meet the criteria for material required of pipe included in that listed specification. (d) Rework and/or regrind material is not allowed in plastic pipe produced after March 6, 2015, used under this part.
- **truncated:** false
- **body characters:** 1245
