# Instrumentation

- **operation:** document
- **citation:** 4 CCR 723-4 Rule 4201
- **title:** Instrumentation
- **source type:** regulation
- **agency:** Colorado Public Utilities Commission
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** A utility purchasing or receiving gas for transportation services shall install, or shall require the interconnecting pipeline to provide, such instruments or meters as may be necessary to furnish information detailing the quantity and quality of gas received into its system as necessary to maintain
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/co-ccr-4-723-4-4201.json
- **markdown:** https://regulus.evalyn.ai/document/co-ccr-4-723-4-4201.md
- **app url:** https://regulus.evalyn.ai/document/co-ccr-4-723-4-4201
- **source url:** https://www.sos.state.co.us/CCR/DisplayRule.do?action=ruleinfo&ruleId=2260&deptID=18&agencyID=96&deptName=Department%20of%20Regulatory%20Agencies&agencyName=Public%20Utilities%20Commission&seriesNum=4%20CCR%20723-4
**body:**

A utility purchasing or receiving gas for transportation services shall install, or shall
require the interconnecting pipeline to provide, such instruments or meters as may be
necessary to furnish information detailing the quantity and quality of gas received into its
system as necessary to maintain measurement accuracy and acceptable gas quality.
- **truncated:** false
- **body characters:** 349
