{"operation":"document","citation":"4 CCR 723-4 Rule 4302","title":"Service Meter Accuracy","source_type":"regulation","agency":"Colorado Public Utilities Commission","status":"current","official":true,"published_on":null,"effective_on":null,"summary":"(a) Before being installed for use by a customer, every gas service meter, whether new, repaired, or removed from service for any cause shall be in good order and, except as provided in paragraph (b) of this rule, shall be adjusted to be correct to within one percent when passing gas at 20 percent o","machine_formats":{"json":"https://regulus.evalyn.ai/document/co-ccr-4-723-4-4302.json","markdown":"https://regulus.evalyn.ai/document/co-ccr-4-723-4-4302.md"},"app_url":"https://regulus.evalyn.ai/document/co-ccr-4-723-4-4302","source_url":"https://www.sos.state.co.us/CCR/DisplayRule.do?action=ruleinfo&ruleId=2260&deptID=18&agencyID=96&deptName=Department%20of%20Regulatory%20Agencies&agencyName=Public%20Utilities%20Commission&seriesNum=4%20CCR%20723-4","body":"(a) Before being installed for use by a customer, every gas service meter, whether\nnew, repaired, or removed from service for any cause shall be in good order and,\nexcept as provided in paragraph (b) of this rule, shall be adjusted to be correct to\nwithin one percent when passing gas at 20 percent of its rated capacity at one-\nhalf inch water column differential.\n(b) New rotary displacement type gas service meters in sizes having a rated\ncapacity of more than 5,000 cubic feet per hour at a differential not to exceed two\ninches water column shall be tested and calibrated at the factory in accordance\nwith recognized and accepted practices. These meters shall also be adjusted to\nbe correct within two percent slow and one percent fast when passing gas at ten\npercent of its rated capacity and shall be adjusted to be correct within one\npercent slow and one percent fast when passing gas at 100 percent of its rated\ncapacity. Prior to reuse of a rotary displacement type meter that has been\nremoved from service, the meter shall pass the same testing criteria as a new\nmeter.","truncated":false,"body_characters":1080}