{"operation":"document","citation":"4 CCR 723-4 Rule 4554","title":"Interim Gas Infrastructure Plan Reporting","source_type":"regulation","agency":"Colorado Public Utilities Commission","status":"current","official":true,"published_on":null,"effective_on":null,"summary":"(a) In calendar years when no gas infrastructure plan is submitted, no later than May 1 in the year after the filing of the utility's last gas infrastructure plan proceeding, as applicable under paragraph 4552(a), the utility shall file an interim gas infrastructure plan report addressing the status","machine_formats":{"json":"https://regulus.evalyn.ai/document/co-ccr-4-723-4-4554.json","markdown":"https://regulus.evalyn.ai/document/co-ccr-4-723-4-4554.md"},"app_url":"https://regulus.evalyn.ai/document/co-ccr-4-723-4-4554","source_url":"https://www.sos.state.co.us/CCR/DisplayRule.do?action=ruleinfo&ruleId=2260&deptID=18&agencyID=96&deptName=Department%20of%20Regulatory%20Agencies&agencyName=Public%20Utilities%20Commission&seriesNum=4%20CCR%20723-4","body":"(a) In calendar years when no gas infrastructure plan is submitted, no later than May\n1 in the year after the filing of the utility’s last gas infrastructure plan proceeding,\nas applicable under paragraph 4552(a), the utility shall file an interim gas\ninfrastructure plan report addressing the status of planned projects and approved\nalternatives from previous gas infrastructure plans.\n(b) The utility shall provide the best available information on the status of each\nplanned project consistent with the information listed in subparagraph 4553(c)(I).\nThe utility will explain in detail the reasons for variances in project costs, the\nscope of work, and implementation timeline.\n(c) The utility shall provide information on the defined programmatic expense work\ncompleted since its last gas infrastructure plan filing.","truncated":false,"body_characters":819}