# Interim Gas Infrastructure Plan Reporting

- **operation:** document
- **citation:** 4 CCR 723-4 Rule 4554
- **title:** Interim Gas Infrastructure Plan Reporting
- **source type:** regulation
- **agency:** Colorado Public Utilities Commission
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** (a) In calendar years when no gas infrastructure plan is submitted, no later than May 1 in the year after the filing of the utility's last gas infrastructure plan proceeding, as applicable under paragraph 4552(a), the utility shall file an interim gas infrastructure plan report addressing the status
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/co-ccr-4-723-4-4554.json
- **markdown:** https://regulus.evalyn.ai/document/co-ccr-4-723-4-4554.md
- **app url:** https://regulus.evalyn.ai/document/co-ccr-4-723-4-4554
- **source url:** https://www.sos.state.co.us/CCR/DisplayRule.do?action=ruleinfo&ruleId=2260&deptID=18&agencyID=96&deptName=Department%20of%20Regulatory%20Agencies&agencyName=Public%20Utilities%20Commission&seriesNum=4%20CCR%20723-4
**body:**

(a) In calendar years when no gas infrastructure plan is submitted, no later than May
1 in the year after the filing of the utility’s last gas infrastructure plan proceeding,
as applicable under paragraph 4552(a), the utility shall file an interim gas
infrastructure plan report addressing the status of planned projects and approved
alternatives from previous gas infrastructure plans.
(b) The utility shall provide the best available information on the status of each
planned project consistent with the information listed in subparagraph 4553(c)(I).
The utility will explain in detail the reasons for variances in project costs, the
scope of work, and implementation timeline.
(c) The utility shall provide information on the defined programmatic expense work
completed since its last gas infrastructure plan filing.