{"operation":"document","citation":"4 CCR 723-4 Rule 4605","title":"Gas Purchase Plans","source_type":"regulation","agency":"Colorado Public Utilities Commission","status":"current","official":true,"published_on":null,"effective_on":null,"summary":"(a) GPP filing requirements. The utility shall file its GPP as a \"Submittal for Determination of Completeness of GPP.\" This submittal shall include the following proceeding caption: \"In the matter of Gas Purchase Plans and Gas Purchase Reports for [utility] for the Gas Purchase Year from July 1, [ye","machine_formats":{"json":"https://regulus.evalyn.ai/document/co-ccr-4-723-4-4605.json","markdown":"https://regulus.evalyn.ai/document/co-ccr-4-723-4-4605.md"},"app_url":"https://regulus.evalyn.ai/document/co-ccr-4-723-4-4605","source_url":"https://www.sos.state.co.us/CCR/DisplayRule.do?action=ruleinfo&ruleId=2260&deptID=18&agencyID=96&deptName=Department%20of%20Regulatory%20Agencies&agencyName=Public%20Utilities%20Commission&seriesNum=4%20CCR%20723-4","body":"(a) GPP filing requirements. The utility shall file its GPP as a “Submittal for\nDetermination of Completeness of GPP.” This submittal shall include the\nfollowing proceeding caption: “In the matter of Gas Purchase Plans and Gas\nPurchase Reports for [utility] for the Gas Purchase Year from July 1, [year]\nthrough June 30, [year].”\n(b) Contents of GPP filing. In the GPP, the utility shall submit to the Commission the\nfollowing:\n(I) the information required by rule 4606;\n(II) the utility’s forecasted quantity of gas to be purchased over the ensuing\ngas purchase year for each service level;\n(III) the utility’s forecasted pricing for each receipt point/area; and\n(IV) the utility’s portfolio management plan.\n(c) Commission procedures for processing filings. Upon receipt of a GPP submittal,\nthe Commission shall assign a proceeding number and shall review the submittal\nsolely for completeness (i.e., compliance with the information requirements of\nthese rules). The Commission shall not: hold a hearing on the substance of the\nGPP, entertain interventions by interested parties, require the filing of testimony\nor permit discovery. The Commission shall not render a decision approving or\ndisapproving the substantive information contained in the submittal.\n(d) Review timelines. Commission staff shall review the submittal and, within 15\ncalendar days of the filing, shall provide written notification to the utility of any\ndeficiencies in the submittal. The utility shall file the requested information, or a\nwritten statement indicating that the utility believes the additional information is\nnot required, within 15 calendar days after the date of the Commission staff\nnotification. Upon receipt of final information or the written statement,\nCommission staff shall place the submittal on the agenda for consideration at the\nnext available Commissioners’ weekly meeting. If the Commission fails to mail its\ndetermination on completeness of the submittal within 15 calendar days of\nreceipt of final information or the written statement, the submittal shall be\ndeemed complete.\n(e) Utilities with multiple GCA rate areas. A utility with more than one approved GCA\nrate area in Colorado shall file a separate GPP for each GCA rate area. These\nGPPs may be filed in a single submittal.\n(f) Modified GPP. A utility shall file a new GPP within 30 days of its determination\nthat the currently effective GPP no longer substantively reflects active purchasing\nconditions or the utility’s planned purchasing practices.","truncated":false,"body_characters":2513}