{"operation":"document","citation":"4 CCR 723-4 Rule 4758","title":"Contents of Gas DSM Cost Adjustment Filing","source_type":"regulation","agency":"Colorado Public Utilities Commission","status":"current","official":true,"published_on":null,"effective_on":null,"summary":"(a) General provisions. (I) A filing for a gas DSM cost adjustment (G-DSMCA) shall contain justifying information sufficient in detail to permit the Commission to determine the accuracy of the supporting calculation. (II) The G-DSMCA filing shall include a complete set of work papers and all other d","machine_formats":{"json":"https://regulus.evalyn.ai/document/co-ccr-4-723-4-4758.json","markdown":"https://regulus.evalyn.ai/document/co-ccr-4-723-4-4758.md"},"app_url":"https://regulus.evalyn.ai/document/co-ccr-4-723-4-4758","source_url":"https://www.sos.state.co.us/CCR/DisplayRule.do?action=ruleinfo&ruleId=2260&deptID=18&agencyID=96&deptName=Department%20of%20Regulatory%20Agencies&agencyName=Public%20Utilities%20Commission&seriesNum=4%20CCR%20723-4","body":"(a) General provisions.\n(I) A filing for a gas DSM cost adjustment (G-DSMCA) shall contain justifying\ninformation sufficient in detail to permit the Commission to determine the\naccuracy of the supporting calculation.\n(II) The G-DSMCA filing shall include a complete set of work papers and all\nother documents relied on in preparing the adjustment.\n(III) The provisions of this rule do not supersede other Commission rules that\ncontain additional applicable filing requirements.\n(b) Specific provisions. The filing shall contain detailed schedules and supporting\ndocuments that establish, at a minimum, the following:\n(I) the detailed calculation of the G-DSMCA for each customer class based\non the following general formula:\n(A) current G-DSMCA factor = (current G-DSMCA cost + deferred G-\nDSMCA cost) / (forecasted sales customer x monthly service\ncharge + forecasted sales gas quantity x base rate); and\n(B) the G-DSMCA factor will also include the current G-DSM bonus\nplus any adjustment necessary to previously approved G-DSM\nbonuses;\n(II) a detailed schedule showing the computation of interest, as applicable, to\ndeferred amounts;\n(III) the absolute and percentage impact of the proposed rate on the base\nrates and on the total monthly bills of typical customers in each customer\nclass;\n(IV) a schedule detailing the allocation of costs to each customer class;\n(V) proposed customer notice detailing rate impact and effective date;\n(VI) proposed tariff implementing the proposed G-DSMCA; and\n\n(VII) if any gas DSM costs are proposed to be recovered by rate base\ntreatment, with a return on the unamortized balance, a statement of\ncurrent net operating earnings, a detailed calculation of the related\nrevenue requirement and an attachment detailing any differences in the\nproposed rate base treatment compared to the regulatory practices\nemployed by the Commission in its last general rate case for the applicant.","truncated":false,"body_characters":1918}