{"operation":"document","citation":"RCSA § 16-280b-A12","title":"Inspections, tests, examinations, checks, surveys, and","source_type":"regulation","agency":"Connecticut Public Utilities Regulatory Authority","status":"current","official":true,"published_on":"2025-06-11","effective_on":"2025-06-11","summary":"surveillance (a) Each Operator shall make any subsequent inspection, test, examination, check, survey or surveillance interval required by any Federal Regulation or State Regulation shorter if the initial results indicate systemic deficiencies that would be improved by shorter intervals. (b) Where shorter intervals are","machine_formats":{"json":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-a12.json","markdown":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-a12.md"},"app_url":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-a12","source_url":"https://eregulations.ct.gov/eRegsPortal/Search/getDocument?guid=%7BE04F6097-0000-CC1C-9D68-25A0BA411C82%7D","body":"surveillance (a) Each Operator shall make any subsequent inspection, test, examination, check, survey or surveillance interval required by any Federal Regulation or State Regulation shorter if the initial results indicate systemic deficiencies that would be improved by shorter intervals. (b) Where shorter intervals are implemented pursuant to subsection (a) of this section, each Operator shall reduce remediation timeframes commensurate with the shortened intervals.","truncated":false,"body_characters":469}