# Inspections, tests, examinations, checks, surveys, and

- **operation:** document
- **citation:** RCSA § 16-280b-A12
- **title:** Inspections, tests, examinations, checks, surveys, and
- **source type:** regulation
- **agency:** Connecticut Public Utilities Regulatory Authority
- **status:** current
- **official:** true
- **published on:** 2025-06-11
- **effective on:** 2025-06-11
- **summary:** surveillance (a) Each Operator shall make any subsequent inspection, test, examination, check, survey or surveillance interval required by any Federal Regulation or State Regulation shorter if the initial results indicate systemic deficiencies that would be improved by shorter intervals. (b) Where shorter intervals are
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ct-rcsa-16-280b-a12.json
- **markdown:** https://regulus.evalyn.ai/document/ct-rcsa-16-280b-a12.md
- **app url:** https://regulus.evalyn.ai/document/ct-rcsa-16-280b-a12
- **source url:** https://eregulations.ct.gov/eRegsPortal/Search/getDocument?guid=%7BE04F6097-0000-CC1C-9D68-25A0BA411C82%7D
**body:**

surveillance (a) Each Operator shall make any subsequent inspection, test, examination, check, survey or surveillance interval required by any Federal Regulation or State Regulation shorter if the initial results indicate systemic deficiencies that would be improved by shorter intervals. (b) Where shorter intervals are implemented pursuant to subsection (a) of this section, each Operator shall reduce remediation timeframes commensurate with the shortened intervals.
- **truncated:** false
- **body characters:** 469
