# Pipelines under structures

- **operation:** document
- **citation:** RCSA § 16-280b-A43
- **title:** Pipelines under structures
- **source type:** regulation
- **agency:** Connecticut Public Utilities Regulatory Authority
- **status:** current
- **official:** true
- **published on:** 2025-06-11
- **effective on:** 2025-06-11
- **summary:** (a) Pipelines are not to be installed in any non-accessible areas underneath buildings, unless approved by the Authority in writing. (b) In accordance with 49 CFR 192.613, as amended from time to time, and section 16- 280b-A57 of the Regulations of Connecticut State Agencies, each Operator shall surveil for areas where
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ct-rcsa-16-280b-a43.json
- **markdown:** https://regulus.evalyn.ai/document/ct-rcsa-16-280b-a43.md
- **app url:** https://regulus.evalyn.ai/document/ct-rcsa-16-280b-a43
- **source url:** https://eregulations.ct.gov/eRegsPortal/Search/getDocument?guid=%7BE04F6097-0000-CC1C-9D68-25A0BA411C82%7D
**body:**

(a) Pipelines are not to be installed in any non-accessible areas underneath buildings, unless approved by the Authority in writing. (b) In accordance with 49 CFR 192.613, as amended from time to time, and section 16- 280b-A57 of the Regulations of Connecticut State Agencies, each Operator shall surveil for areas where any Pipeline exists in a non-accessible area underneath a building. Not later than 180 calendar days from the discovery of any Pipeline in a non- accessible area underneath a building, the Operator shall ensure such building is removed or relocate the affected portion of such Pipeline, unless an extension is approved by the Authority in writing.
- **truncated:** false
- **body characters:** 668
