{"operation":"document","citation":"RCSA § 16-280b-A48","title":"Examination of buried Pipeline when exposed","source_type":"regulation","agency":"Connecticut Public Utilities Regulatory Authority","status":"current","official":true,"published_on":"2025-06-11","effective_on":"2025-06-11","summary":"(a) Any inspection conducted pursuant to 49 CFR 192.459, as amended from time to time, shall include examination for disbonded coatings. (b) Each Operator shall ensure that any damaged coating on a cathodically protected Pipeline found pursuant to 49 CFR 192.459, as amended from time to time, shall be remediated not la","machine_formats":{"json":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-a48.json","markdown":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-a48.md"},"app_url":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-a48","source_url":"https://eregulations.ct.gov/eRegsPortal/Search/getDocument?guid=%7BE04F6097-0000-CC1C-9D68-25A0BA411C82%7D","body":"(a) Any inspection conducted pursuant to 49 CFR 192.459, as amended from time to time, shall include examination for disbonded coatings. (b) Each Operator shall ensure that any damaged coating on a cathodically protected Pipeline found pursuant to 49 CFR 192.459, as amended from time to time, shall be remediated not later than 6 months after being discovered.","truncated":false,"body_characters":361}