# Examination of buried Pipeline when exposed

- **operation:** document
- **citation:** RCSA § 16-280b-A48
- **title:** Examination of buried Pipeline when exposed
- **source type:** regulation
- **agency:** Connecticut Public Utilities Regulatory Authority
- **status:** current
- **official:** true
- **published on:** 2025-06-11
- **effective on:** 2025-06-11
- **summary:** (a) Any inspection conducted pursuant to 49 CFR 192.459, as amended from time to time, shall include examination for disbonded coatings. (b) Each Operator shall ensure that any damaged coating on a cathodically protected Pipeline found pursuant to 49 CFR 192.459, as amended from time to time, shall be remediated not la
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ct-rcsa-16-280b-a48.json
- **markdown:** https://regulus.evalyn.ai/document/ct-rcsa-16-280b-a48.md
- **app url:** https://regulus.evalyn.ai/document/ct-rcsa-16-280b-a48
- **source url:** https://eregulations.ct.gov/eRegsPortal/Search/getDocument?guid=%7BE04F6097-0000-CC1C-9D68-25A0BA411C82%7D
**body:**

(a) Any inspection conducted pursuant to 49 CFR 192.459, as amended from time to time, shall include examination for disbonded coatings. (b) Each Operator shall ensure that any damaged coating on a cathodically protected Pipeline found pursuant to 49 CFR 192.459, as amended from time to time, shall be remediated not later than 6 months after being discovered.
- **truncated:** false
- **body characters:** 361
