{"operation":"document","citation":"RCSA § 16-280b-A69","title":"Inspection and testing of Gate Stations and District","source_type":"regulation","agency":"Connecticut Public Utilities Regulatory Authority","status":"current","official":true,"published_on":"2025-06-11","effective_on":"2025-06-11","summary":"Regulator Stations (a) Each Operator shall ensure that inspections conducted pursuant to 49 CFR 192.739(a), as amended from time to time, include: (1) removal, inspection, and replacement, if necessary, of all filters; (2) inspection, testing, and maintenance, if necessary, of any heating equipment; (3) verification of","machine_formats":{"json":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-a69.json","markdown":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-a69.md"},"app_url":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-a69","source_url":"https://eregulations.ct.gov/eRegsPortal/Search/getDocument?guid=%7BE04F6097-0000-CC1C-9D68-25A0BA411C82%7D","body":"Regulator Stations (a) Each Operator shall ensure that inspections conducted pursuant to 49 CFR 192.739(a), as amended from time to time, include: (1) removal, inspection, and replacement, if necessary, of all filters; (2) inspection, testing, and maintenance, if necessary, of any heating equipment; (3) verification of compliance with section 16-280b-A21 of the Regulations of Connecticut State Agencies; and (4) a final inspection that ensures proper position of all valves and restoration of all security devices. (b) The Operator shall ensure that any deficiencies found during the inspections required pursuant to 49 CFR 192.739, as amended from time to time, and this section shall be remediated prior to the Gate Station or District Regulator Station being returned to service if the deficiency affects the safe operation of the station but in no case shall remediation occur later than 1 year from the date of inspection.","truncated":false,"body_characters":930}