{"operation":"document","citation":"RCSA § 16-280b-A71","title":"Telemetry or recording gauges","source_type":"regulation","agency":"Connecticut Public Utilities Regulatory Authority","status":"current","official":true,"published_on":"2025-06-11","effective_on":"2025-06-11","summary":"Each Operator shall ensure that any confirmed abnormally high or low pressure found pursuant to 49 CFR 192.741(c), as amended from time to time, is remediated immediately.","machine_formats":{"json":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-a71.json","markdown":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-a71.md"},"app_url":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-a71","source_url":"https://eregulations.ct.gov/eRegsPortal/Search/getDocument?guid=%7BE04F6097-0000-CC1C-9D68-25A0BA411C82%7D","body":"Each Operator shall ensure that any confirmed abnormally high or low pressure found pursuant to 49 CFR 192.741(c), as amended from time to time, is remediated immediately.","truncated":false,"body_characters":171}