{"operation":"document","citation":"RCSA § 16-280b-A73","title":"Valve maintenance","source_type":"regulation","agency":"Connecticut Public Utilities Regulatory Authority","status":"current","official":true,"published_on":"2025-06-11","effective_on":"2025-06-11","summary":"(a) Valve maintenance required pursuant to 49 CFR 192.747, as amended from time to time, shall include: (1) checking alignment to ensure a key or wrench can operate the valve; (2) clearing any debris from the valve box or Vault that would interfere with or delay the operation of the valve; 23 (3) checking for adequate ","machine_formats":{"json":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-a73.json","markdown":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-a73.md"},"app_url":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-a73","source_url":"https://eregulations.ct.gov/eRegsPortal/Search/getDocument?guid=%7BE04F6097-0000-CC1C-9D68-25A0BA411C82%7D","body":"(a) Valve maintenance required pursuant to 49 CFR 192.747, as amended from time to time, shall include: (1) checking alignment to ensure a key or wrench can operate the valve; (2) clearing any debris from the valve box or Vault that would interfere with or delay the operation of the valve; 23 (3) checking for adequate lubrication; (4) partial operation; and (5) verification of the correct valve position. (b) Curb Valves on Service Lines where the Customer Meter is located inside the structure, and there is no outside above-ground Service Line valve, shall be inspected at least once every 5 calendar years, but at intervals not exceeding 63 months. Any deficiencies found shall be remediated not later than 1 year after discovery. (c) The prompt remedial action required pursuant to 49 CFR 192.747(b), as amended from time to time, shall occur in a reasonably expedited manner, but not later than the next regularly scheduled check.","truncated":false,"body_characters":938}