{"operation":"document","citation":"RCSA § 16-280b-B17","title":"Inspections","source_type":"regulation","agency":"Connecticut Public Utilities Regulatory Authority","status":"current","official":true,"published_on":"2025-06-11","effective_on":"2025-06-11","summary":"(a) Each Operator shall perform daily inspections of construction-related Covered Tasks. (b) The inspections performed pursuant to subsection (a) of this section, shall be accomplished by inspectors assigned to oversee a maximum of three crews per day, except due to short-term staff absences. 29 (c) New construction co","machine_formats":{"json":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-b17.json","markdown":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-b17.md"},"app_url":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-b17","source_url":"https://eregulations.ct.gov/eRegsPortal/Search/getDocument?guid=%7BE04F6097-0000-CC1C-9D68-25A0BA411C82%7D","body":"(a) Each Operator shall perform daily inspections of construction-related Covered Tasks. (b) The inspections performed pursuant to subsection (a) of this section, shall be accomplished by inspectors assigned to oversee a maximum of three crews per day, except due to short-term staff absences. 29 (c) New construction contractors and new crew leaders of existing construction contractors shall be inspected while performing construction-related Covered Tasks until clear competency in performing the applicable Covered Tasks has been demonstrated.","truncated":false,"body_characters":547}