# Inspections

- **operation:** document
- **citation:** RCSA § 16-280b-B17
- **title:** Inspections
- **source type:** regulation
- **agency:** Connecticut Public Utilities Regulatory Authority
- **status:** current
- **official:** true
- **published on:** 2025-06-11
- **effective on:** 2025-06-11
- **summary:** (a) Each Operator shall perform daily inspections of construction-related Covered Tasks. (b) The inspections performed pursuant to subsection (a) of this section, shall be accomplished by inspectors assigned to oversee a maximum of three crews per day, except due to short-term staff absences. 29 (c) New construction co
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ct-rcsa-16-280b-b17.json
- **markdown:** https://regulus.evalyn.ai/document/ct-rcsa-16-280b-b17.md
- **app url:** https://regulus.evalyn.ai/document/ct-rcsa-16-280b-b17
- **source url:** https://eregulations.ct.gov/eRegsPortal/Search/getDocument?guid=%7BE04F6097-0000-CC1C-9D68-25A0BA411C82%7D
**body:**

(a) Each Operator shall perform daily inspections of construction-related Covered Tasks. (b) The inspections performed pursuant to subsection (a) of this section, shall be accomplished by inspectors assigned to oversee a maximum of three crews per day, except due to short-term staff absences. 29 (c) New construction contractors and new crew leaders of existing construction contractors shall be inspected while performing construction-related Covered Tasks until clear competency in performing the applicable Covered Tasks has been demonstrated.
- **truncated:** false
- **body characters:** 547
