{"operation":"document","citation":"RCSA § 16-280b-B23","title":"Damage prevention","source_type":"regulation","agency":"Connecticut Public Utilities Regulatory Authority","status":"current","official":true,"published_on":"2025-06-11","effective_on":"2025-06-11","summary":"(a) For purposes of this section: (1) \"Excavation Ticket\" means a notification provided by an excavator to the central clearinghouse, as defined in section 16-345(4) of the Connecticut General Statutes. (2) \"Markout\" means the process of marking the approximate location of an underground facility on the surface with pa","machine_formats":{"json":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-b23.json","markdown":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-b23.md"},"app_url":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-b23","source_url":"https://eregulations.ct.gov/eRegsPortal/Search/getDocument?guid=%7BE04F6097-0000-CC1C-9D68-25A0BA411C82%7D","body":"(a) For purposes of this section: (1) \"Excavation Ticket\" means a notification provided by an excavator to the central clearinghouse, as defined in section 16-345(4) of the Connecticut General Statutes. (2) \"Markout\" means the process of marking the approximate location of an underground facility on the surface with paint, flags or stakes pursuant to section 16-345-5 of the Regulations of Connecticut State Agencies. (b) The actions required by section 16-345-3(b) of the Regulations of Connecticut State Agencies shall not be performed by contractors. (c) Each Operator shall define the limits of blasting near such Operator's Pipeline Facilities including: (1) setting limits on the peak particle velocity based on Pipe material, Pipe size and geologic conditions; (2) requiring monitoring of peak particle velocity utilizing appropriate equipment to ensure that the maximum peak particle velocity is not exceeded; and (3) conducting a leakage survey at the end of each blasting sequence for a distance considered adequate to ensure the integrity of the Pipeline Facilities. (d) Each Operator shall have a program to inspect excavation activities in the vicinity of such Operator's Pipeline Facilities that includes: (1) for each calendar year, performing a number of inspections at least equal to 2.5 percent of the previous calendar year's number of Excavation Tickets received; (2) not more than 25 percent of the inspections on excavations performed by the Operator or by contractors working for the Operator; (3) inspections only being conducted by individuals other than those who performed the Markout; and (4) the risk-based selection of inspections, considering the type and duration of excavation activity, the proximity to Pipeline Facilities, the proximity to critical facilities, and the past experience with the excavator.","truncated":false,"body_characters":1841}