{"operation":"document","citation":"RCSA § 16-280b-B26","title":"Odorization of Gas","source_type":"regulation","agency":"Connecticut Public Utilities Regulatory Authority","status":"current","official":true,"published_on":"2025-06-11","effective_on":"2025-06-11","summary":"(a) The periodic sampling required pursuant to 49 CFR 192.625(f), as amended from time to time, shall be performed: (1) at least once each calendar month, but at intervals not exceeding 45 calendar days; and (2) at locations where Gas flow may affect odorant concentrations. (b) Not later than January 1, 2037, each Gate","machine_formats":{"json":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-b26.json","markdown":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-b26.md"},"app_url":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-b26","source_url":"https://eregulations.ct.gov/eRegsPortal/Search/getDocument?guid=%7BE04F6097-0000-CC1C-9D68-25A0BA411C82%7D","body":"(a) The periodic sampling required pursuant to 49 CFR 192.625(f), as amended from time to time, shall be performed: (1) at least once each calendar month, but at intervals not exceeding 45 calendar days; and (2) at locations where Gas flow may affect odorant concentrations. (b) Not later than January 1, 2037, each Gate Station shall contain equipment to introduce odorant properly and safely into each Pipeline. (c) Each Operator shall ensure there is adequate odorant and odorant sampling when a new Main is Placed In Service or when portable compressed natural Gas or liquefied natural Gas is introduced into any Pipeline.","truncated":false,"body_characters":626}