{"operation":"document","citation":"RCSA § 16-280b-B8","title":"Extra High Pressure Pipeline requirements","source_type":"regulation","agency":"Connecticut Public Utilities Regulatory Authority","status":"current","official":true,"published_on":"2025-06-11","effective_on":"2025-06-11","summary":"27 Installation of Pipelines, other than Gate Stations, District Regulator Stations and repairs to Pipelines, with an MAOP in excess of 250 pounds per square inch gauge, shall require approval of the Authority.","machine_formats":{"json":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-b8.json","markdown":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-b8.md"},"app_url":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-b8","source_url":"https://eregulations.ct.gov/eRegsPortal/Search/getDocument?guid=%7BE04F6097-0000-CC1C-9D68-25A0BA411C82%7D","body":"27 Installation of Pipelines, other than Gate Stations, District Regulator Stations and repairs to Pipelines, with an MAOP in excess of 250 pounds per square inch gauge, shall require approval of the Authority.","truncated":false,"body_characters":210}