# Extra High Pressure Pipeline requirements

- **operation:** document
- **citation:** RCSA § 16-280b-B8
- **title:** Extra High Pressure Pipeline requirements
- **source type:** regulation
- **agency:** Connecticut Public Utilities Regulatory Authority
- **status:** current
- **official:** true
- **published on:** 2025-06-11
- **effective on:** 2025-06-11
- **summary:** 27 Installation of Pipelines, other than Gate Stations, District Regulator Stations and repairs to Pipelines, with an MAOP in excess of 250 pounds per square inch gauge, shall require approval of the Authority.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ct-rcsa-16-280b-b8.json
- **markdown:** https://regulus.evalyn.ai/document/ct-rcsa-16-280b-b8.md
- **app url:** https://regulus.evalyn.ai/document/ct-rcsa-16-280b-b8
- **source url:** https://eregulations.ct.gov/eRegsPortal/Search/getDocument?guid=%7BE04F6097-0000-CC1C-9D68-25A0BA411C82%7D
**body:**

27 Installation of Pipelines, other than Gate Stations, District Regulator Stations and repairs to Pipelines, with an MAOP in excess of 250 pounds per square inch gauge, shall require approval of the Authority.
- **truncated:** false
- **body characters:** 210