{"operation":"document","citation":"RCSA § 16-280b-C4","title":"Materials","source_type":"regulation","agency":"Connecticut Public Utilities Regulatory Authority","status":"current","official":true,"published_on":"2025-06-11","effective_on":"2025-06-11","summary":"Steel, copper and polyethylene shall be installed for Mains and Service Lines, except below-ground copper shall only be installed upstream of the first pressure regulator, unless some other material is approved by the Authority.","machine_formats":{"json":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-c4.json","markdown":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-c4.md"},"app_url":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-c4","source_url":"https://eregulations.ct.gov/eRegsPortal/Search/getDocument?guid=%7BE04F6097-0000-CC1C-9D68-25A0BA411C82%7D","body":"Steel, copper and polyethylene shall be installed for Mains and Service Lines, except below-ground copper shall only be installed upstream of the first pressure regulator, unless some other material is approved by the Authority.","truncated":false,"body_characters":228}