# Maps

- **operation:** document
- **citation:** RCSA § 16-280b-C7
- **title:** Maps
- **source type:** regulation
- **agency:** Connecticut Public Utilities Regulatory Authority
- **status:** current
- **official:** true
- **published on:** 2025-06-11
- **effective on:** 2025-06-11
- **summary:** Each Operator shall maintain maps of each Petroleum Gas Distribution System for the life of such system, with sufficient detail to accurately determine the location of each: (1) Main and Service Line, including size and characteristics; (2) Emergency Valve; (3) storage container, including size and characteristics; (4)
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ct-rcsa-16-280b-c7.json
- **markdown:** https://regulus.evalyn.ai/document/ct-rcsa-16-280b-c7.md
- **app url:** https://regulus.evalyn.ai/document/ct-rcsa-16-280b-c7
- **source url:** https://eregulations.ct.gov/eRegsPortal/Search/getDocument?guid=%7BE04F6097-0000-CC1C-9D68-25A0BA411C82%7D
**body:**

Each Operator shall maintain maps of each Petroleum Gas Distribution System for the life of such system, with sufficient detail to accurately determine the location of each: (1) Main and Service Line, including size and characteristics; (2) Emergency Valve; (3) storage container, including size and characteristics; (4) cathodic protection anode and impressed current system; (5) Customer Meter; 44 (6) regulator; (7) vaporizer; and (8) hydrostatic relief valve.
- **truncated:** false
- **body characters:** 463
