{"operation":"document","citation":"RCSA § 16-280b-C8","title":"Public awareness","source_type":"regulation","agency":"Connecticut Public Utilities Regulatory Authority","status":"current","official":true,"published_on":"2025-06-11","effective_on":"2025-06-11","summary":"Any incorrect Operator name or emergency telephone number on a Pipeline Facility shall be removed or covered not later than 30 calendar days after it is discovered or after a change to the Operator name or emergency telephone number.","machine_formats":{"json":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-c8.json","markdown":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-c8.md"},"app_url":"https://regulus.evalyn.ai/document/ct-rcsa-16-280b-c8","source_url":"https://eregulations.ct.gov/eRegsPortal/Search/getDocument?guid=%7BE04F6097-0000-CC1C-9D68-25A0BA411C82%7D","body":"Any incorrect Operator name or emergency telephone number on a Pipeline Facility shall be removed or covered not later than 30 calendar days after it is discovered or after a change to the Operator name or emergency telephone number.","truncated":false,"body_characters":233}