{"operation":"document","citation":"Fla. Admin. Code R. 25-12.082","title":"Construction Notice","source_type":"regulation","agency":"Florida Public Service Commission","status":"current","official":true,"published_on":null,"effective_on":"2012-10-11","summary":"Written Notice shall be given to the Commission at least 15 days prior to start of all major construction or alteration of pipeline facilities, stating the size, approximate location and contemplated time of construction. Notice is required when the pipeline involved is both at least 2 inches in dia","machine_formats":{"json":"https://regulus.evalyn.ai/document/fl-fac-25-12.082.json","markdown":"https://regulus.evalyn.ai/document/fl-fac-25-12.082.md"},"app_url":"https://regulus.evalyn.ai/document/fl-fac-25-12.082","source_url":"https://flrules.org/gateway/RuleNo.asp?ID=25-12.082","body":"Written Notice shall be given to the Commission at least 15 days prior to start of all major construction or alteration of pipeline facilities, stating the size, approximate location and contemplated time of construction. Notice is required when the pipeline involved is both at least 2 inches in diameter as well as 2,000 feet or more in length.","truncated":false,"body_characters":346}