{"operation":"document","citation":"HAR 6-77-110","title":"HAR 6-77-110 Customer meter installations: operating pressure","source_type":"regulation","agency":"Hawaii Public Utilities Commission","status":"current","official":true,"published_on":"1994-04-15","effective_on":"1994-09-03","summary":"used at a pressure that is more than sixty-seven percent of the manufacturer's shell test pressure. (b) Each newly installed meter manufactured after November 12, 1970, must have been tested to a minimum of 10 p.s.i.g. (c) A rebuilt or repaired tinned steel case meter may not be used at a pressure t","machine_formats":{"json":"https://regulus.evalyn.ai/document/hi-har-har-6-77-110.json","markdown":"https://regulus.evalyn.ai/document/hi-har-har-6-77-110.md"},"app_url":"https://regulus.evalyn.ai/document/hi-har-har-6-77-110","source_url":"https://puc.hawaii.gov/wp-content/uploads/2026/04/HAR-6-77-Transp-of-Gas-03-31-2026.pdf","body":"used at a pressure that is more than sixty-seven percent of the manufacturer's shell test pressure. (b) Each newly installed meter manufactured after November 12, 1970, must have been tested to a minimum of 10 p.s.i.g. (c) A rebuilt or repaired tinned steel case meter may not be used at a pressure that is more than fifty percent of the pressure used to test the meter after rebuilding or repairing. [Eff ] (Auth: HRS '269-6) (Imp: 49 C.F.R. '192.359, October 1, 1990)","truncated":false,"body_characters":469}