{"operation":"document","citation":"HAR 6-77-144","title":"HAR 6-77-144 General requirements","source_type":"regulation","agency":"Hawaii Public Utilities Commission","status":"current","official":true,"published_on":"1994-04-15","effective_on":"1994-09-03","summary":"pipeline, or return to service a segment of pipeline that has been relocated or replaced, until: (1) It has been tested in accordance with this subchapter and section 6-77-166 to substantiate the maximum allowable operating pressure; and (2) Each potentially hazardous leak has been located and elimi","machine_formats":{"json":"https://regulus.evalyn.ai/document/hi-har-har-6-77-144.json","markdown":"https://regulus.evalyn.ai/document/hi-har-har-6-77-144.md"},"app_url":"https://regulus.evalyn.ai/document/hi-har-har-6-77-144","source_url":"https://puc.hawaii.gov/wp-content/uploads/2026/04/HAR-6-77-Transp-of-Gas-03-31-2026.pdf","body":"pipeline, or return to service a segment of pipeline that has been relocated or replaced, until: (1) It has been tested in accordance with this subchapter and section 6-77-166 to substantiate the maximum allowable operating pressure; and (2) Each potentially hazardous leak has been located and eliminated. (b) The test medium must be liquid, air, natural gas, or inert gas that is: (1) Compatible with the material of which the pipeline is constructed; (2) Relatively free of sedimentary materials; and (3) Except for natural gas, nonflammable. (c) Except as provided in section 6-77-145(a), if air, natural gas, or inert gas is used as the test medium, the following maximum hoop stress limitations apply: ___________________________________________________________ │ Maximum hoop stress allowed as Class location │ percentage of SMYS │ Natural gas │ Air or inert gas │ │ 1.................│ 80 │ 80 2.................│ 30 │ 75 3.................│ 30 │ 50 4.................│ 30 │ 40 ____________________│_______________│_______________________ (d) Each joint used to tie in a test segment of pipeline is excepted from the specific test requirements of this subchapter, but each non-welded joint must be leak tested at not less than its operating pressure. [Eff 49 C.F.R. '192.503, October 1, 1990) ] (Auth: HRS '269-6) (Imp:","truncated":false,"body_characters":1327}