- **summary:** operator shall take immediate temporary measures to protect the public whenever: (1) A leak, imperfection or damage that impairs its serviceability is found in a segment of steel transmission line operating at or above forty percent of the SMYS; and (2) It is not feasible to make a permanent repair 
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/hi-har-har-6-77-178.json
- **markdown:** https://regulus.evalyn.ai/document/hi-har-har-6-77-178.md
- **app url:** https://regulus.evalyn.ai/document/hi-har-har-6-77-178
- **source url:** https://puc.hawaii.gov/wp-content/uploads/2026/04/HAR-6-77-Transp-of-Gas-03-31-2026.pdf
**body:**

operator shall take immediate temporary measures to protect the public whenever: (1) A leak, imperfection or damage that impairs its serviceability is found in a segment of steel transmission line operating at or above forty percent of the SMYS; and (2) It is not feasible to make a permanent repair at the time of discovery. As soon as feasible, the operator shall make permanent repairs. (b) Except as provided in section 6-77-181(a)(3), no operator may use a welded patch as a means of repair. [Eff 49 C.F.R. '192.711, October 1, 1990) ] (Auth: HRS '269-6) (Imp: