{"operation":"document","citation":"HAR 6-77-183","title":"HAR 6-77-183 Distribution systems: Patrolling","source_type":"regulation","agency":"Hawaii Public Utilities Commission","status":"current","official":true,"published_on":"1994-04-15","effective_on":"1994-09-03","summary":"be determined by the severity of the conditions which could cause failure or leakage, and the consequent hazards to public safety. (b) Mains in place or on structures where anticipated physical movement or external loading could cause failure or leakage must be patrolled at intervals not exceeding 4","machine_formats":{"json":"https://regulus.evalyn.ai/document/hi-har-har-6-77-183.json","markdown":"https://regulus.evalyn.ai/document/hi-har-har-6-77-183.md"},"app_url":"https://regulus.evalyn.ai/document/hi-har-har-6-77-183","source_url":"https://puc.hawaii.gov/wp-content/uploads/2026/04/HAR-6-77-Transp-of-Gas-03-31-2026.pdf","body":"be determined by the severity of the conditions which could cause failure or leakage, and the consequent hazards to public safety. (b) Mains in place or on structures where anticipated physical movement or external loading could cause failure or leakage must be patrolled at intervals not exceeding 4-1/2 months, but at least four times each calendar year. [Eff ] (Auth: HRS '269 -6) (Imp: 49 C.F.R. '192.721, October 1, 1990)","truncated":false,"body_characters":426}