{"operation":"document","citation":"HAR 6-77-76","title":"HAR 6-77-76 Limitations on welders","source_type":"regulation","agency":"Hawaii Public Utilities Commission","status":"current","official":true,"published_on":"1994-04-15","effective_on":"1994-09-03","summary":"nondestructive testing may weld compressor station pipe and components. (b) No welder may weld with a particular welding process unless, within the preceding six calendar months, the welder has engaged in welding with that process. (c) A welder qualified under section 6-77-75(a) may not weld unless ","machine_formats":{"json":"https://regulus.evalyn.ai/document/hi-har-har-6-77-76.json","markdown":"https://regulus.evalyn.ai/document/hi-har-har-6-77-76.md"},"app_url":"https://regulus.evalyn.ai/document/hi-har-har-6-77-76","source_url":"https://puc.hawaii.gov/wp-content/uploads/2026/04/HAR-6-77-Transp-of-Gas-03-31-2026.pdf","body":"nondestructive testing may weld compressor station pipe and components. (b) No welder may weld with a particular welding process unless, within the preceding six calendar months, the welder has engaged in welding with that process. (c) A welder qualified under section 6-77-75(a) may not weld unless within the preceding six calendar months the welder has had one weld tested and found acceptable under section 3 or 6 of API Standard 1104, except that a welder qualified under an earlier edition previously listed in Appendix A may weld but may not requalify under that earlier edition. [Eff ] (Auth: HRS '269-6) (Imp: 49 C.F.R. '192.229, October 1, 1990)","truncated":false,"body_characters":655}