# HAR 6-77-84 General

- **operation:** document
- **citation:** HAR 6-77-84
- **title:** HAR 6-77-84 General
- **source type:** regulation
- **agency:** Hawaii Public Utilities Commission
- **status:** current
- **official:** true
- **published on:** 1994-04-15
- **effective on:** 1994-09-03
- **summary:** will sustain the longitudinal pullout or thrust forces caused by contraction or expansion of the piping or by anticipated external or internal loading. (b) Each joint must be made in accordance with written procedures that have been proven by test or experience to produce strong gastight joints. (c)
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/hi-har-har-6-77-84.json
- **markdown:** https://regulus.evalyn.ai/document/hi-har-har-6-77-84.md
- **app url:** https://regulus.evalyn.ai/document/hi-har-har-6-77-84
- **source url:** https://puc.hawaii.gov/wp-content/uploads/2026/04/HAR-6-77-Transp-of-Gas-03-31-2026.pdf
**body:**

will sustain the longitudinal pullout or thrust forces caused by contraction or expansion of the piping or by anticipated external or internal loading. (b) Each joint must be made in accordance with written procedures that have been proven by test or experience to produce strong gastight joints. (c) Each joint must be inspected to insure compliance with this subchapter. [Eff ] (Auth: HRS '269-6) (Imp: 49 C.F.R. '192.273, October 1, 1990)
- **truncated:** false
- **body characters:** 441
