{"operation":"document","citation":"199 IAC 10.12","title":"Transmission line factors.","source_type":"regulation","agency":"Iowa Utilities Commission","status":"current","official":true,"published_on":"2026-08-19","effective_on":"2025-07-16","summary":"Factors considered by the commission in determining whether a pipeline is a transmission line and is, therefore, required to have a permit include but are not limited to: 1. The definitions of a transmission line in ASME B31.8 and 49 CFR 192.3. 2. Pipeline and Hazardous Materials Safety Administrati","machine_formats":{"json":"https://regulus.evalyn.ai/document/ia-iac-199-10-12.json","markdown":"https://regulus.evalyn.ai/document/ia-iac-199-10-12.md"},"app_url":"https://regulus.evalyn.ai/document/ia-iac-199-10-12","source_url":"https://www.legis.iowa.gov/DOCS/ACO/IAC/LINC/Chapter.199.10.pdf","body":"Factors considered by the commission in determining whether a pipeline is a transmission line and is, therefore, required to have a permit include but are not limited to:\n\n1. The definitions of a transmission line in ASME B31.8 and 49 CFR 192.3.\n\n2. Pipeline and Hazardous Materials Safety Administration interpretations.\n\n3. The location of a distribution center.\n\n4. Interconnection with an interstate pipeline.\n\n5. Location of distribution regulator stations downstream of a proposed distribution center.\n\n6. Whether a proposed distribution center has more than one source of supply and the type of pipeline that provides the supply.\n\n7. Transfer of ownership of gas.\n\n8. Reduction in pressure of pipeline at a meter.\n\n9. No resale of gas downstream of a distribution center.","truncated":false,"body_characters":778}