{"operation":"document","citation":"170 IAC 5-3-2.6","title":"Establishment of MAOP on distribution system","source_type":"regulation","agency":"Indiana Utility Regulatory Commission","status":"current","official":true,"published_on":"2022-03-17","effective_on":null,"summary":"Sec. 2.6. (a) An operator complies with 49 CFR 192.619(a)(4) for existing pipelines less than one hundred (100) psi if the operator establishes the maximum allowable operating pressure (MAOP) on a section of distribution system pipeline in compliance with Method 5 for establishing MAOP in 49 CFR 192","machine_formats":{"json":"https://regulus.evalyn.ai/document/in-iac-170-5-3-2-6.json","markdown":"https://regulus.evalyn.ai/document/in-iac-170-5-3-2-6.md"},"app_url":"https://regulus.evalyn.ai/document/in-iac-170-5-3-2-6","source_url":"https://iar.iga.in.gov/code/2026/170/5#170-5-3-2.6","body":"Sec. 2.6. (a) An operator complies with 49 CFR 192.619(a)(4) for existing pipelines less than one hundred (100) psi if the operator establishes the maximum allowable operating pressure (MAOP) on a section of distribution system pipeline in compliance with Method 5 for establishing MAOP in 49 CFR 192.624(c)(5). For purposes of this section, the following table replaces Table 1 to § 192.624(c)(5)(ii): Required Patrols Leakage surveys After the final leak survey to establish the MAOP under this After the final leak survey to establish the MAOP under this section, at least 1 additional patrol within the following 3 section, at least 1 additional leak survey within the following 3 months. months. (b) Pipelines with an MAOP established under this section shall thereafter be patrolled and surveyed in accordance with 49 CFR 192.721 and 49 CFR 192.723.\n\nAuthority: IC 8-1-1-3; IC 8-1-22.5-4\nAffected: IC 8-1-2; IC 8-1-22.5\n\n(Indiana Utility Regulatory Commission; 170 IAC 5-3-2.6; filed Mar 17, 2022, 12:34 p.m.: 20220413-IR-170210213FRA)","truncated":false,"body_characters":1041}