{"operation":"document","citation":"LAC 43:XIII §1729","title":"Installation of Plastic Pipelines by Trenchless Excavation [49 CFR 192.329] [Formerly §1725]","source_type":"regulation","agency":"Louisiana Office of Conservation","status":"current","official":true,"published_on":null,"effective_on":null,"summary":"A. Plastic pipelines installed by trenchless excavation must comply with the following. [49 CFR 192.329] 1. Each operator must take practicable steps to provide sufficient clearance for installation and maintenance activities from other underground utilities and/or structures at the time of installa","machine_formats":{"json":"https://regulus.evalyn.ai/document/la-lac-43-xiii-1729.json","markdown":"https://regulus.evalyn.ai/document/la-lac-43-xiii-1729.md"},"app_url":"https://regulus.evalyn.ai/document/la-lac-43-xiii-1729","source_url":"https://www.doa.la.gov/doa/osr/louisiana-administrative-code/","body":"A. Plastic pipelines installed by trenchless excavation must comply with the following. [49 CFR 192.329]\n\n1. Each operator must take practicable steps to provide sufficient clearance for installation and maintenance activities from other underground utilities and/or structures at the time of installation. [49 CFR 192.329(a)]\n\n2. For each pipeline section, plastic pipe and components that are pulled through the ground must use a weak link, as defined by § 503, to ensure the pipeline will not be damaged by any excessive forces during the pulling process. [49 CFR 192.329(b)]\n\nAUTHORITY NOTE: Promulgated in accordance with R.S. 30:501 et seq.\n\nHISTORICAL NOTE: Promulgated by the Department of Natural Resources, Office of Conservation, LR 46:1586 (November 2020), amended LR 47:1144 (August 2021).","truncated":false,"body_characters":802}