# Installation of Plastic Pipelines by Trenchless Excavation [49 CFR 192.329] [Formerly §1725]

- **operation:** document
- **citation:** LAC 43:XIII §1729
- **title:** Installation of Plastic Pipelines by Trenchless Excavation [49 CFR 192.329] [Formerly §1725]
- **source type:** regulation
- **agency:** Louisiana Office of Conservation
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** A. Plastic pipelines installed by trenchless excavation must comply with the following. [49 CFR 192.329] 1. Each operator must take practicable steps to provide sufficient clearance for installation and maintenance activities from other underground utilities and/or structures at the time of installa
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/la-lac-43-xiii-1729.json
- **markdown:** https://regulus.evalyn.ai/document/la-lac-43-xiii-1729.md
- **app url:** https://regulus.evalyn.ai/document/la-lac-43-xiii-1729
- **source url:** https://www.doa.la.gov/doa/osr/louisiana-administrative-code/
**body:**

A. Plastic pipelines installed by trenchless excavation must comply with the following. [49 CFR 192.329]

1. Each operator must take practicable steps to provide sufficient clearance for installation and maintenance activities from other underground utilities and/or structures at the time of installation. [49 CFR 192.329(a)]

2. For each pipeline section, plastic pipe and components that are pulled through the ground must use a weak link, as defined by § 503, to ensure the pipeline will not be damaged by any excessive forces during the pulling process. [49 CFR 192.329(b)]

AUTHORITY NOTE: Promulgated in accordance with R.S. 30:501 et seq.

HISTORICAL NOTE: Promulgated by the Department of Natural Resources, Office of Conservation, LR 46:1586 (November 2020), amended LR 47:1144 (August 2021).